ban
CONTACT US
  • export@chinacoalintl.com
  • +86-15376502811
  • No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China
Position:Home  /  Industry Info  /  The Construction Of "Six Major Systems" For Safe Avoidance Of Underground Electric Locomotive Is Perfect

The Construction Of "Six Major Systems" For Safe Avoidance Of Underground Electric Locomotive Is Perfect

Date:2021-03-10     Label:

Electric Locomotive

Battery Locomotive

Underground Mining Locomotive

The "six systems" of underground electric locomotive avoidance in mines refer to monitoring and monitoring, staff positioning, emergency avoidance, self-rescue by pressure, water supply and communication and communication.

According to the request of the notice, when the mine electric locomotive is shut down and reorganized, the establishment and perfection of the "six major systems" shall be used as the acceptance condition, and none of the failures shall be subject to the resumption acceptance. The construction of new mines, mergers and reorganizations, and integration of technological transformation of mines should include the "six major systems" in the safety equipment of the coal mine establishment project, and strictly implement the "three simultaneous" designations of safety equipment. In the process of mine design approval, engineering construction, and project acceptance, the experiment "six major systems" that has not been designed and established is "one-vote veto".

This move is part of the national coal mine safety and consumption inspection that was launched from June to the end of September this year. This inspection is intended to inspect all mine electric locomotives, underground mining locomotive, consumption systems, mining operations, and various mining operations. The equipment and various consumption management staff conduct a thorough inspection.

The Construction Of 'Six Major Systems' For Safe Avoidance Of Underground Electric Locomotive Is Perfect

+

+

Please leave a message
skype
message